description
Current Position:HOME > NEWS > NEWS

The Second Domestically Built Large Cruise Ship Achieves Dock Floating!

Date:
2025-04-28
From:

On April 28, the second domestically built large cruise ship "Adora Flora City " (H1509) smoothly achieved the milestone of dock floating at SWS., Ltd., a subsidiary of CSSC. This marks the transition from the "first half" of structural and outfitting construction to the stage of interior decoration and system completion and commissioning. 

1747212659799.jpg

From entering the dock for assembly to the first floating, the H1509 ship has reduced the time by one month compared to the first domestically built large cruise ship "Adora Flora City" Based on a 20% reduction in the total project working hours, it has utilized 57.2% of the actual working hours to complete over 70% of the overall project progress, an increase of 12% compared to the same period of the first ship. Moreover, with more projects installed on the entire ship, the floating weight of the ship has increased by 3,654 tons. This indicates a significant improvement in construction efficiency and floating integrity compared to the first ship. The realization of the floating node has laid a solid foundation for the completion and delivery by the end of 2026 and signifies an important breakthrough in the comprehensive establishment of a lean and efficient design and construction capability for large cruise ships in China's shipbuilding industry.