On Nov. 6, H1071, the first VLGC in China built by SCH---H1071 successfully came back from sea trial. The successful sea trial of H1071, laid a solid foundation for the on-time delivery, and has accumulated valuable experiences for following vessels.
Another Report: On Nov. 3, H1064, the last 180k DWT bulk carrier built for CSBC successfully came back from sea trial, which laid a good foundation for the delivery.