On Sep. 11, the last 115k DWT bulk carrier (H1008) built for COSBULK was launched 3 days ahead of the schedule, which marks the construction of first batch of the thirty 115k DWT bulk carriers in drydock was completed. The construction of H1008 carried on many improvements of her sister ships. Through a lot of exploration and practice, SCH has g...
On Sep. 10, the Certification Ceremony for the first batch of low-temperature welders was held in Assembly Dept. The Assistant President of SWS---Mr. Liu Jianfeng, and the directors of HR Dept., Quality Assurance and Control Dept., Accuracy Management Dept. and Assembly Dept. attended the ceremony and awarded the certification marks---Helmet Sticke...
On Sep. 13, in the occasion of the Mid-Autumn festival, the evening party with the theme as "Love is around you "hosted by SWS Youth League Committee, PR Dept. and Offshore Engineering Project Dept was held in Yue Miao Foster Home. This activity was for the purpose of bringing the endless happiness and sincere blessings to the special and innocent ...
On August 28th, SWS released "The Notice of 2013 Quality Month", that indicated the "Quality Month " was then unveiled . The guiding principle of the "Quality Month" in this year is focusing on the development program of CSSC " 12th five years" and fully promoting the overall quality management. Through further perfecting the establishment of th...
After the launching of the first Jack-up H1288 built for POD on Aug. 28, the keel laying of the second POD Jack-up H1289 was held in No.2 Drydock on Aug. 30, that marks the construction of H1289 entered into the erection and assembly phase. It is the first time for SWS, in which there are one offshore project on quay and two projects constructing i...
From Aug. 15 to Aug. 16, the 3-people delegation from China Quality Association came to SWS for evaluating and reviewing the working site management of Manufacturing Dept. SWS top management Mr. Wang Qi and Mr. Chen Jun attended the meeting. The Quality Assurance and Control Dept. had begun to plan the "National Working Site Evaluation" of Manuf...
The world class Offshore building base in Shanghai has made better and better performances. On Aug. 28, the first Jack-up Drilling Rig built in Shanghai, which is designed and built for Norwegian Owner by SWS, was successfully launched. In the middle of July, SWS signed building contracts for 2+2 CJ46-X100-D Jack-up Drilling Rigs with Singapore Own...
On Aug. 20, the Block Construction Clarification of VLGC was held in SWS. It is the first time for SWS to undertake the construction of VLGC, which marks that SWS has made a big step towards the product diversification. In the meeting, the R & D Institute and the relevant departments of SCH have made instruction, exchanges and clarification on t...
On Aug. 21st, SWS held 2013 the 2nd Quality Committee Meeting. The departments and subject units which were first awarded as "Quality Improvement Achievement" were commended at the meeting. In the meeting, "The Requirement of Achieving Standard for Teams in CSSC" was announced, and the 22 items of four categories of the requirement were explain...
At 1 pm on Aug. 20, after 6-day hard work on the sea and finished all task with the tireless efforts and concerted coordination of all personnel, the 4,600 TEU Container Ship (H1026) built by SCH for German RHL successfully came back from sea trial. The top management and the directors of each department came to the quay to welcome the vessel back....
On Aug.8, SWS Offshore held the Classification Contract Signing Ceremony of 2+2 PSV which was built for Pacific Radiance, that indicated the cooperation between SWS Offshore and DNV officially started. The new Regional President of DNV, Mr. Torgeir Sterri and his delegation came to SWS Offshore to meet with top management of SWS Offshore, and th...
On Aug. 20, the company held the Welcome Ceremony for the new employees of SWS & SCH who graduated in 2013. On the welcome ceremony, the representative---Zhang Xing, on behalf of all new employees, expressed their appreciations to our company and their confidence of working hard in the future. It is reported that there are 127 new employees join...
On Aug. 12, the kick off meeting of CJ46 Jack-up Project (H1368, H1369) was held in SWS. The top management --- Wang Qi, Chen Jun, Deputy Chief Technical Officer --- Geng Weixiang, Xu Zifu, Assistant President of SWS --- Liu Jianfeng, Zhu Yu, Chen Gang, Zou Yongxin, the project managers and other representatives of relevant departments attended th...
The kick off meeting of H1340 and H1341 was jointly held by SWS Design &Research Institute and DNV on Aug.14th, which indicated the Design of the first built PSV projects has been comprehensively started. The Deputy Director of Design Dept. No.2 and the Project Design Manager, Mr. Zhang Xiaokai and the relevant personnel attended this meeting. T...
SWS & SCH signed building contract of 16,000 TEU Container Ship and delivered 9,400 TEU Container Ship. Report form our Correspondent: China has entered into the world leading group in development, design and construction of ultra large Container Ships. At the end of July, as a large scale shipyard which is held by Shanghai Waigaoqiao Shipbuildi...