In the morning on Dec. 12, the keel laying ceremony of H1369, the CJ46 Jack-up built for BOD was held in No.2 Platform in SWS.
This is the third Jack-up Drilling Rig following up H1368 and H1378, which will be erected on the ground, and it is also the first time for SWS to realize the general erection of 4 sets offshore rigs within one year. So far, the series production of offshore products has been realized in SWS.