description
Current Position:HOME > NEWS > NEWS

The 3rd Round of Launching from SCH Drydock Was Accomplished

Date:
2016-05-22
From:
chinasws
May 22, H1345 and H1315, the two 180,000 DWT Bulk Carriers  for Herun Group and Cara Shipping, were successfully launched from drydock.  Meanwhile, the semi-hull of the two vessels successfully were floated in the same drydock, which are the H1336, the first built 300,000 VLCC and H1346, the 180,000 DWT Bulk Carrier.

This round of launching was not only accomplished the task of "double 40 days construction period" in drydock , but also the constructional integrity of each vessel had been achieved at the highest level.

Taking this opportunity of launching in success, the engineering performance of Bulk Carriers has been improved as good as the construction of extra large scale of Containers and large scale of VLOCs, which are regard as the best reputable products in SCH.