description
Current Position:HOME > NEWS > NEWS

Good News of Both Merchant Vessels and Offshore Projects came one after another in Early of September

Date:
2014-09-12
From:
chinasws
In September, the good news for milestones including steel cutting, keel laying, launching and floating came from SWS quay area and drydocks, the shipbuilding has entered into a gold period. On Sep. 1st, H1306, the 318,000 DWT VLCC was launched from No.2 Drydock. Meanwhile, H1320, the JU2000E Jack Up Drill Rig was also launched from the same place. Beside of that, H1319, the other JU2000E Jack Up Drill Rig was successfully floated in No.2 Drydock. At the same day, the Steel Cutting Ceremonies of both H1379---the CJ46 Jack Up Drilling Rig and H1348---the JU2000E Drilling Rig were held respectively. On Sep. 3rd, the top size container ship in China, 18,000TEU Container ship, H6002, successfully started her construction stage of Keel Laying. On Sep.4th, H1268, the 180,000 DWT Bulk Carrier sailed back to SWS after her successful sea trial. On Sep.5th, H1268, the 180,000 DWT Bulk Carrier started her sea trial. At the same day, the steel cutting ceremony of H1333 and H1372, the two 180,000 DWT Bulk Carriers was held in Cutting Center. On Sep. 9th, H1329 sailed back to SWS after her successful sea trial. On Sep. 10th, H1283 and H1330 were successfully launched from No.1 Drydock, Meanwhile, the semi-hull vessels, H1277 and H1333 were successfully floated in the same Drydock. On Sep. 11th, the Keel Laying Ceremonies of H1286 and H1334 were held. Since Sep.1st till Sep. 11th, within 11 days, SWS has completed totally 17 millstones, the good news for both Merchant Vessels and Offshore Projects came one after another. With the good collaboration of each department, every staff united as one team to overcome the difficulties and fully completed all working targets. This new round of climax for production has paved way for the completion of annual work plan.