description
Current Position:HOME > NEWS > NEWS

The Construction of Jack-up Drilling Rig---H1319 Started

Date:
2013-11-20
From:
chinasws
On Nov. 12, the Steel Cutting Ceremony of H1319---JU-2000E drilling rig was held in SWS. H1319 is the 4th drilling rig built for POD in SWS, which is also the 5th drilling rig constructed in SWS in the recent two years.